Laika Cheesecake and Espresso: 1430 Unicorn Ave., Ste. 106, New Braunfels
Type of work: new construction
Estimated cost: $60,000
Timeline: Nov. 30, 2022-Jan. 31, 2023
Scope of work: first time interior finish-out of a new retail space to include mechanical, plumbing and electrical trades
Root Cellar Café: 1090 I-35 N. Business, New Braunfels
Type of work: renovation/alteration
Estimated cost: $150,000
Timeline: Nov. 8, 2022-Jan. 31, 2023
Scope of work: renovation of an existing restaurant for new restaurant business
Buc-ee’s New Braunfels Car Wash: 2760 I-35, New Braunfels
Type of work: new construction
Estimated cost: $6 million
Timeline: Feb. 1-Aug. 31, 2023
Scope of work: new construction of car wash tunnel at existing Buc-ee’s Travel Center in New Braunfels, Texas
Oak Run Apartments: northwest corner of Oak Run Parkway and Loop 337, New Braunfels
Type of work: new construction
Estimated cost: $59.78 million
Timeline: Feb. 6, 2023-Jan. 10, 2025
Scope of work: three garden-style, four-story multifamily buildings with tuck-under garages, surface parking, 330 units; amenities include clubhouse, fitness room, business center, standalone mail kiosk, dog park and a pool courtyard
The Neue: 699 W. San Antonio St., New Braunfels
Type of work: new construction
Estimated cost: $13 million
Timeline: Dec. 9, 2022-Dec. 9, 2023
Scope of work: new ground-up mixed-use project with retail and office occupancies at street level and multifamily residential dwelling units above on podium slab construction
“>
Pet Supplies Plus: 2736 Loop 337, New Braunfels
Type of work: renovation/alteration
Estimated cost: $478,900
Timeline: July 1-Oct. 1, 2023
Scope of work: interior alteration to build out a new Pet Supplies Plus retail store in an existing building shell
Little Land Play Gym: 2009 South Walnut Ave., New Braunfels
Type of work: renovation/alteration
Estimated cost: $300,000
Timeline: Nov. 30, 2022-May 1, 2023
Scope of work: new mechanical, electrical and plumbing and wall; tenant improvement build-out
Jenkins Retail: 840 I-35 S. Business, New Braunfels
Type of work: new construction
Estimated cost: $500,000
Timeline: Jan. 2-June 30, 2023
Scope of work: site work foundation paving metal building
Goldenrod Industrial: 687 Holdcan Drive, New Braunfels
Type of work: new construction
Estimated cost: $20 million
Timeline: Dec. 1, 2022-Aug. 1, 2023
Scope of work: the scope of work for this project includes a 260,343-square-foot new construction building of steel and concrete tilt-wall construction, and all required site and utility improvements to support an office/warehouse use
Editor’s Note: This commercial permit could not be mapped.
Pilot Travel Center: 14142 TX 337 Loop, New Braunfels
Type of work: renovation/alteration
Estimated cost: $1.9 million
Timeline: Feb. 20-June 30, 2023
Scope of work: remodel of the existing facility with updated checkout counter and equipment, updated drink bar, deli, cabinetry, equipment, new walk-in beverage cooler, updated prep area, new game room, new public and exterior facade
10 latest commercial permits filed in Round Rock, including Kalahari Resorts Texas outdoor expansion
Teravista Retail Center: 2960 FM 1460, Round Rock
Type of work: new construction
Estimated cost: $1.5 million
Timeline: Dec. 1, 2022-April 1, 2023
Scope of work: one-story, steel-framed building; exterior only
Tropical Smoothie Cafe: 17280 N. FM 620, Ste. 110, Round Rock
Type of work: renovation/alteration
Estimated cost: $277,000
Timeline: Dec. 1, 2022-April 1, 2023
Scope of work: tenant interior remodeling for restaurant, including mechanical, electrical and plumbing changes
Kalahari Round Rock outdoor expansion: 3001 Kalahari Blvd., Round Rock
Type of work: additions to existing building
Estimated cost: $5 million
Timeline: Nov. 15, 2022-June 15, 2023
Scope of work: outdoor expansion to the existing resort pool; includes an action river, children’s slide pool and bar pool; one main building with restrooms, storage and electrical and merch rooms, one open-air bar structure and one building for river ware equipment
Baylor Scott & White: 3161 Eagles Nest St., Ste. 340, Round Rock
Type of work: renovation/alteration
Estimated cost: $100,000
Timeline: Oct. 24-Dec. 22
Scope of work: refresh/update interior finish
HRT Retail Core and Shell: 455 University Blvd., Round Rock
Type of work: new construction
Estimated cost: $1 million
Timeline: Dec. 5, 2022-Aug. 7, 2023
Scope of work: new two-story core and shell building for future retail and office use
“>
Palm Valley Spec Suite: 503 E. Palm Valley Blvd., Ste. 220, Round Rock
Type of work: renovation/alteration
Estimated cost: $143,556
Timeline: Oct. 6-Nov. 6
Scope of work: provide and install electrical and heating, ventilation and air conditioning needs; provide and install new plumbing fixtures, provide and install flooring and ceiling
Levi’s Round Rock: 4401 N. I-35, Ste. 239, Round Rock
Type of work: renovation/alteration
Estimated cost: $60,000
Timeline: Jan. 1-April 1, 2023
Scope of work: minor refresh of an existing Levi’s store; shelving, racking, cash wrap, etc.
SWIFT: 4425 University Blvd., Round Rock.
Type of work: new construction
Estimated cost: $800,000
Timeline: Feb. 1, 2023-Feb. 29, 2024
Scope of work: new 9,352-square-foot one-story building with 7,028-square-foot convenience store and 2,324-square-foot future lease space
Back Porch Social: 309 W. Liberty Ave., Round Rock.
Type of work: renovation/alteration
Estimated cost: $150,000
Timeline: Nov. 15, 2022-Feb. 15, 2023
Scope of work: a building renovation and addition for an entertainment arcade in the existing front structure with a restroom addition; existing garage structure to be converted into a commercial kitchen along with a small addition to that building
Round Rock Police Department landscape enhancements: 2701 N. Mays St., Round Rock.
Type of work: renovation/alteration
Estimated cost: $400,000
Timeline: Jan. 1, 2022-Sept. 1, 2023
Scope of work: new concrete sidewalk entry and monument area, associated landscape and irrigation improvements
Action Behavior Center: 1261 Hero Way W., Bldg. A, Leander
Type of work: renovation/alteration
Estimated cost: $300,000
Timeline: July 5, 2022-Dec. 2, 2022
Scope of work: build-out of a shell space
Hounds Town USA: 10181 E. Crystal Falls Parkway, Leander
Type of work: new construction
Estimated cost: $457,000
Timeline: Jan. 9, 2023-March 27, 2023
Scope of work: interior tenant improvement project, interior work only of an existing shell space to construct a Hounds Town dog day care, boarding and pet spa facility
Curry Fusion: 10824 East Crystal Falls Road, Leander
Type of work: new construction
Estimated cost: $400,000
Timeline: Jan. 1, 2023-June 1, 2023
Scope of work: finish out 2,000-square-foot restaurant (frame, sheetrock, mechanical, electrical and plumbing, cabinetry, millwork, paint etc.)
Retail Shell – Building 2: 1890 Crystal Falls Parkway, Leander.
Type of work: new construction
Estimated cost: $760,000
Timeline: Dec. 14, 2022-April 28, 2023
Scope of work: construction of a new retail shell building and all associated site work
Swadeshi Plaza Retail Shell Building 2: 7680 Hwy. 183A, Leander
Type of work: new construction
Estimated cost: $600,000
Timeline: Nov. 19, 2022-Feb. 19, 2023
Scope of work: new construction of retail building
“>
Planet Fitness: TBD, Cedar Park.
Type of work: new construction
Estimated cost: $3 million
Timeline: March 24, 2023-Oct. 6, 2023
Scope of work: new construction of a 19,961-square-foot shell building and associated improvements
Editor’s note: This commercial permit could not be mapped.
BNails Cedar Park LLC: 1335 E. Whitestone Blvd., Ste. 202A & 203A, Cedar Park
Type of work: renovation/alteration
Estimated cost: $500,000
Timeline: Jan. 5, 2023-June 16, 2023
Scope of work: remodel, nail salon, 5,000-square-feet
Instill Coffee: 410 W. Whitestone Blvd., Bldg. 2, Ste. 202, Cedar Park
Type of work: renovation/alteration
Estimated cost: $493,200
Timeline: Nov. 14, 2022-March 31, 2023
Scope of work: tenant finish-out for coffee shop including dining area, service area, utility and associated restrooms
PD Labs: 1513 E. New Hope Drive, Bldg. E, Cedar Park.
Type of work: renovation/alteration
Estimated cost: $1.3 million
Timeline: Dec. 1, 2022-June 1, 2023
Scope of work: finish-out of a new shell building
St. Julian of Norwich Episcopal Church: 3823 Brushy Creek Road, Cedar Park
Type of work: new construction
Estimated cost: $5.5 million
Timeline: Nov. 21, 2022-Aug. 25, 2023
Scope of work: new 6,993-square-foot parish hall to include worship areas, seven classrooms, four offices, kitchen and restrooms along with associated site work
Valor North Austin Expansion: 14200 I-35 N., Austin
Type of work: new construction
Estimated cost: $21 million
Timeline: Nov. 1, 2022-Jan. 31, 2024
Scope of work: adding a new three-story high school onto an existing campus
Museum of Illusions: 11010 Domain Drive, Ste. 100, Austin
Type of work: renovation/alteration
Estimated cost: $800,000
Timeline: Dec. 1, 2022-March 1, 2023
Scope of work: tenant remodel includes existing tenant build-out demolition, new fixtures and finishes
PayPal: 10025 Alterra Parkway, Ste. 2300 & 2400, Austin
Type of work: new construction
Estimated cost: $8 million
Timeline: Nov. 28, 2022-May 22, 2023
Scope of work: first-generation commercial interior tenant improvements for PayPal at the 23rd and 24th levels of Domain Tower 2, construction of nonstructural partitions, ceilings and finishes
Topgolf: 2700 Esperanza Crossing, Austin
Type of work: renovation/alteration
Estimated cost: $1.5 million
Timeline: Jan. 2, 2023-Jan. 27, 2023
Scope of work: replacement of finishes and light fixtures both interior and exterior, replacement of exterior egress stair on either side of the building
St. David’s North Austin Medical Center: 12221 Mopac Expressway, Austin
Type of work: renovation/alteration
Estimated cost: $100,000
Timeline: Nov. 21, 2022-April 28, 2023
Scope of work: renovating existing operation room to comply with code to be a bronchoscopy room
“>
Caritas of Austin North: 9027 Northgate Blvd., Ste. R5-6, Austin.
Type of work: renovation/alteration
Estimated cost: $65 million
Timeline: Nov. 15, 2022-Oct. 1, 2023
Scope of work: tenant improvement providing new electrical, mechanical and plumbing for a new open office and storage space to expand Caritas of Austin’s north client services branch
McKalla MetroRail Red Line Station: 10612 ½ Delta Drive, Austin
Type of work: new construction
Estimated cost: $12 million
Timeline: Dec. 1, 2022-Dec. 31, 2023
Scope of work: new commuter rail station, site improvements and utility relocations
Royal United: 8200 N. MoPac Expressway, Ste. 240, Austin
Type of work: renovation/alteration
Estimated cost: $250,000
Timeline: Nov. 7, 2022-March 6, 2023
Scope of work: the demolition, finish-out and combination of two existing tenant suites. suite occupancy classification and use group remains unchanged by the scope of this work
Keyence: 9737 Great Hills Trail, Ste. 320, Austin
Type of work: renovation/alteration
Estimated cost: $500,000
Timeline: Oct. 24, 2022-Dec. 19, 2022
Scope of work: office remodel
Pattern Bioscience: 9600 Great Hills Trail, Ste. 100E, Austin
Type of work: renovation/alteration
Estimated cost: $265,153
Timeline: Nov. 1, 2022-Jan. 31, 2023
Scope of work: demolition of existing walls, ceilings, and finishes; removing existing mechanical/electrical/plumbing systems; and construction of new walls, ceilings, finishes as well as new power and data locations
Starbucks: Schultz Lane, Pflugerville
Type of work: new construction
Estimated cost: $650,000
Timeline: Jan. 1, 2023-May 1, 2023
Scope of work: construct Starbucks shell and site improvements; minimal electrical and plumbing included; site improvements include utilities, paving, sidewalks, parking and site signage
Camp Doublecreek: 3311 Kelly Lane, Pflugerville
Type of work: new construction
Estimated cost: $200,000
Timeline: Jan. 1, 2023-May 31, 2023
Scope of work: new youth day camp buildings
Hobby Lobby: Pflugerville
Type of work: new construction
Estimated cost: $4 million
Timeline: Jan. 16, 2023-Oct. 16, 2023
Scope of work: new building and site work
Editor’s Note: This commercial permit could not be mapped.
QuikTrip: 1105 Old Austin Hutto Road, Pflugerville
Type of work: new construction
Estimated cost: $475,000
Timeline: May 1, 2023-Dec. 1, 2023
Scope of work: the new construction of a convenience store with retail gasoline sales
Dick’s Sporting Goods: 19000 Limestone Commercial Drive, Ste. 200, Pflugerville
Type of work: renovation/alteration
Estimated cost: $250,000
Timeline: Jan. 29, 2023-March 1, 2023
Scope of work: renovation of a single-level Dick’s Sporting Goods retail space for the creation of a new footwear department and associated storage
“>
Salad and Go: 130 Chris Kelley Blvd., Hutto
Type of work: new construction
Estimated cost: $300,000
Timeline: Jan. 30, 2023-April 28, 2023
Scope of work: ground-up
Marco’s Pizza: 6111 FM 1660, Ste. 300, Hutto
Type of work: renovation/alteration
Estimated cost: $215,000
Timeline: Nov. 15, 2022-Jan. 16, 2023
Scope of work: first-time interior alteration
Flooring Solutions: 134 TK Industrial Blvd., Hutto
Type of work: new construction
Estimated cost: $1.465 million
Timeline: Oct. 24, 2022-June 30, 2023
Scope of work: interior office finish-out in an existing single-story shell building; interior office area to be conditioned; warehouse area to be nonconditioned; mechanical equipment to be mounted on the roof
FM 1660 at Mager Lane improvements: intersection of FM 1660 and Mager Lane, Hutto
Type of work: renovation/alteration
Estimated cost: $2.41 million
Timeline: Oct. 3, 2022-July 31, 2023
Scope of work: proposed roadway widening, pedestrian facilities, drainage, signals, signing and pavement marking improvements
CRI Hutto-Office and Warehouse: Chandler Road and FM 1660, Hutto
Type of work: new construction
Estimated cost: $1.5 million
Timeline: Nov. 15, 2022-Nov. 15, 2023
Scope of work: new site work and construction of two metal buildings for offices and warehouse; interior space includes offices, a conference room, break room, restrooms, shower and production area
Foxtrot – City Hall: 301 W. Second St., Ste. 101, Austin
Type of work: renovation/alteration
Estimated cost: $500,000
Timeline: Nov. 14, 2022-March 23, 2023
Scope of work: interior renovation of an existing restaurant
Hattie B’s Hot Chicken: 2529 S. Lamar Blvd., Austin
Type of work: renovation/alteration
Estimated cost: $800,000
Timeline: Nov. 7, 2022-July 17, 2023
Scope of work: interior alteration of an existing restaurant suite, no change in use; additional square footage and exterior work; includes adjustments to the existing kitchen, including mechanical, electrical and plumbing work
Oilcan Harry’s: 315 Lavaca St., Austin
Type of work: renovation/alteration
Estimated cost: $200,000
Timeline: Dec. 1, 2022-May 23, 2023
Scope of work: new tenant finish-out of existing space to be a nightclub
Stripsteak ATX: 110 San Antonio St., Ste. R140, Austin
Type of work: renovation/alteration
Estimated cost: $2.92 million
Timeline: Nov. 21, 2022-March 15, 2023
Scope of work: renovation of existing restaurant space, new bar millwork and seating, new wood screen wall and sliding panels, new private dining room, cosmetic changes in existing restrooms
22nd and San Antonio apartments: 2200 San Antonio St., Austin
Type of work: new construction
Estimated cost: $80 million
Timeline: Feb. 27, 2023-May 30, 2025
Scope of work: 30-story multifamily high-rise, four levels of below-grade parking, two levels of rooftop amenity with 216 units
“>
Green Pastures Hotel: 811 W. Live Oak St., Austin
Type of work: new construction
Estimated cost: $24 million
Timeline: Nov. 2, 2022-April 3, 2024
Scope of work: new hotel building with 63 rooms and ancillary uses
Brooklyn Dumpling Shop: 1401 E. 6th St., Bldg. 1, Ste. 201, Austin
Type of work: renovation/alteration
Estimated cost: $300,000
Timeline: Nov. 1, 2022-March 1, 2023
Scope of work: fully sprinkled restaurant fit-out
Annie B: 416 W. 12th St., Austin
Type of work: new construction
Estimated cost: $165 million
Timeline: April 1, 2023-Oct. 1, 2025
Scope of work: 316-unit high-rise multifamily development with 439,099 gross residential square feet and 586,448 total gross square feet, including a 339-space above-grade parking garage
Women’s Partners in Health: 1111 W. 34th St., Austin
Type of work: renovation/alteration
Estimated cost: $1.65 million
Timeline: Nov. 1, 2022-Aug. 31, 2023
Scope of work: remodel of existing office space for new tenant
Vera Bank BOH: 1111 W. Sixth St., Austin
Type of work: renovation/alteration
Estimated cost: $900,000
Timeline: Dec. 12, 2022-July 10, 2023
Scope of work: tenant finish-out
Tesla – 1013 W. University Avenue, Ste. 99, Georgetown.
Type of work: new construction
Estimated cost: $175,000
Timeline: Jan. 2, 2023-Jan. 2, 2024
Scope of work: electrical infrastructure
Salon Suites – 5361 Williams Drive, Georgetown.
Type of work: renovation/alteration
Estimated cost: $450,000
Timeline: Nov. 15, 2022-March 15, 2023
Scope of work: scope of work is for an existing shell structure to be converted into salon suites
Berry Creek Apartments – East of IH-35 & TX-130, Georgetown.
Type of work: new construction
Estimated cost: $600,000
Timeline: March 3, 2023-Nov. 11, 2024
Scope of work: apartments for rent
Editor’s Note: This commercial permit could not be mapped.
ONX Finish Out – 4047 Airport Road, Georgetown.
Type of work: new construction
Estimated cost: $2,250,000
Timeline: Nov. 1, 2022-March 31, 2023
Scope of work: tenant finish-out
Harmony Public School, Elementary School, Longhorn Junction – FM 1460 & Blue Ridge Drive, Georgetown.
Type of work: new construction
Estimated cost: $14,000,000
Timeline: Feb. 15, 2023-March 15, 2023
Scope of work: the project scope of work includes a ground-up construction of 59,000-square-feet of elementary school facility, including parking lot, playground and landscaping
Editor’s Note: This commercial permit could not be mapped.
“>
Kohl’s Sephora Remodel – 1019 W. University Avenue, Georgetown.
Type of work: renovation/alteration
Estimated cost: $200,000
Timeline: Jan. 1, 2023-April 3, 2023
Scope of work: 2,500-square-foot interior sales floor remodel
Deer Haven Commercial – 3900 Williams Drive, Georgetown.
Type of work: new construction
Estimated cost: $1,000,000
Timeline: Nov. 1, 2022-Nov. 1, 2023
Scope of work: new building, shell only. one-story construction to be slab-on grade and light gauge metal structure with brick and stucco exterior finish
Ascalon Medical Park – 4829 Williams Drive, Georgetown.
Type of work: new construction
Estimated cost: $7,500,000
Timeline: Dec. 12, 2022-Jan. 31, 2024
Scope of work: new construction of a medical park
Surgery Center of Georgetown ASC – 1011 Wolf Lakes Drive, Georgetown.
Type of work: renovation/alteration
Estimated cost: $10,500,000
Timeline: Oct. 10, 2022-May 1, 2023
Scope of work: 19,664-square-foot ambulatory surgery center being built within a newly constructed core/shell building
Riverstone Subdivision – 3313 & 3321 Highway 29 W., Georgetown.
Type of work: new construction
Estimated cost: $51,850
Timeline: Oct. 1, 2022-Oct. 1, 2023
Scope of work: residential subdivision infrastructure including public sidewalks and curb ramps
Check out construction plans for a new Japanese Restaurant coming to West Sixth Street, renovations to Frost Tower and more.
10 commercial permits filed recently in Northwest Austin, including new VooDoo Doughnut
Check out construction plans for a new tea and coffee shop, a retail candy store, a cheesecake shop and a fitness studio.
10 latest commercial permits in Drippings Springs, Southwest Austin, including new Jo’s Coffee
Check out construction plans for a restaurant remodel for The Local in Southwest Austin, plus a new office warehouse space in Dripping Springs.
See construction plans for a new Pilates fitness studio, a new Anytime Fitness location, and a new RV and boat ramp storage facility.
10 latest commercial permits filed in Pflugerville, Hutto, including new pizza shop, sports bar
A new Habitat for Humanity ReStore and Hotworx Studio are planned for the area as well as a new nail studio and Austin Diagnostic Clinic location.
10 latest commercial permits filed in Round Rock, including new Clean Eatz, Pet Supplies Plus
See construction plans for a covered rooftop and bar addition at Round Rock Tavern and a new multipurpose facility at Round Rock Christian Academy.
10 commercial permits filed recently in Georgetown, including two new business parks
A new oral surgery office, a Dollar General, a physical therapy clinic and a medical office building are some of Georgetown’s latest construction plans.
Domino’s Pizza and Scooter’s Coffee locations are planned for Leander, and Cedar Park plans include a new barbershop, library and office building.
See construction plans for Hill Country Studios, the San Marcos Administration Building, Texas State University and Live Oak Academy.
A new storage facility, food bank and urgent care clinic are in the works in New Braunfels.
Yeti Bee Cave: 12700 Hill Country Blvd., Ste. T-115, Bee Cave
Type of work: renovation/alteration
Estimated cost: $630,200
Timeline: Oct. 1, 2022-Jan. 31, 2023
Scope of work: lease space remodel, relocate walls, new flooring, paint finishes; no mechanical or plumbing work
Austin Engineering Co. Inc: 3595 S. RR 620, Stes. 200, 220, 225, Bee Cave
Type of work: new construction
Estimated cost: $14 million
Timeline: Aug. 8, 2022-July 31, 2023
Scope of work: new construction of an academic building, gymnasium and stage; renovation of the existing building on-site is also included
Milan Laser: 12600 Hill Country Road, Ste. R134, Bee Cave
Type of work: renovation/alteration
Estimated cost: $200,000
Timeline: Oct. 3-Nov. 11
Scope of work: tenant improvement commercial including mechanical, electrical and plumbing
BodyBar: 12101 Bee Caves Road, Ste. 5A, Bee Cave
Type of work: renovation/alteration
Estimated cost: $150,000
Timeline: Nov. 1, 2022-March 1, 2023
Scope of work: interior tenant finish-out for a Pilates fitness studio, including lobby, exercise studio, private training room and restrooms
Anytime Fitness: 18217 W. Hwy. 71, Spicewood
Type of work: renovation/alteration
Estimated cost: $345,526
Timeline: Nov. 1-Dec. 15
Scope of work: tenant build-out of area leased by owner in new building; work includes building interior walls and restrooms including showers and lavatories, new ductwork, rooftop units, plumbing and electrical work
“>
ATEX Boat and RV Storage: 914 S. Pace Bend Road, Spicewood
Type of work: new construction
Estimated cost: $1 million
Timeline: Nov. 17, 2022-April 30, 2023
Scope of work: RV and boat ramps
Austin Regional Clinic: 5656 Bee Caves Road, Stes. G-200 and H-201, West Lake Hills
Type of work: renovation/alteration
Estimated cost: $280,000
Timeline: Nov. 7, 2022-Feb. 28, 2023
Scope of work: remodel of existing interior lease space for construction of an approximately 3,041-square-foot medical office and clinic; no change of use is proposed
Urgent Vet: 2009 Main St., Ste. 450, West Lake Hills
Type of work: renovation/alteration
Estimated cost: $500,000
Timeline: Jan. 4, 2022-April 5, 2023
Scope of work: interior renovation
Taco Flats: 900 S. RM 620, Bldg. C., Ste. 104, Lakeway
Type of work: renovation/alteration
Estimated cost: $95,000
Timeline: Aug. 15-Sept. 30
Scope of work: update electrical, furniture, fixtures, plumbing and add soffit over bar
Lakeway Town Center: 2418 S. RM 620, Ste. 200, Lakeway
Type of work: renovation/alteration
Estimated cost: $100,000
Timeline: Sept. 1-Dec. 1
Scope of work: non-sprinklered, open-office renovation
FM 1044 Storage: 1938 FM 1044, New Braunfels
Type of work: new construction
Estimated cost: $6.2 million
Timeline: Dec. 1, 2022-Dec. 1, 2023
Scope of work: a combination of six one-story metal framed self-storage buildings set throughout the property as Phase 1; four buildings will be conditioned spaces and two buildings nonconditioned; the office and toilet rooms are located in Building A
Festhaus at Schlitterbahn: 400 N. Liberty Ave., New Braunfels
Type of work: renovation/alteration
Estimated cost: $4.99 million
Timeline: Oct. 24, 2022-April 23, 2023
Scope of work: structural, electrical, mechanical, plumbing and demolition of old building to replace with a new and updated version with restrooms
SOS Food Bank: 256 W. Merriweather, New Braunfels
Type of work: new construction
Estimated cost: $482,145
Timeline: Nov. 1, 2022-Feb. 28, 2023
Scope of work: new construction metal building for SOS Food Bank
Vista Salon Suites: 664 S. Walnut Ave., Ste. 680, New Braunfels
Type of work: renovation/alteration
Estimated cost: $1.2 million
Timeline: Oct. 1, 2022-Feb. 1, 2023
Scope of work: interior remodel
Sammelplatz: 391 Landa St., New Braunfels
Type of work: renovation/alteration
Estimated cost: $1.16 million
Timeline: Sept. 30, 2022-May 30, 2023
Scope of work: tenant improvement of existing business spaces into executive suites with multiple conference rooms
“>
New Braunfels Christian Academy Stadium & Field House: 220 FM 1863, New Braunfels
Type of work: new construction
Estimated cost: $6.3 million
Timeline: Jan. 15, 2022-Aug. 15, 2023
Scope of work: new football stadium, track, bleachers, press box and field house building
New Braunfels Utilities Trinity Membrane Treatment Plant & Pump Station Expansion: 3295 Westpointe Drive, New Braunfels
Type of work: new construction
Estimated cost: $540,000
Timeline: Dec. 19, 2022-April 28, 2024
Scope of work: new variable frequency drive building to house electrical variable frequency drives for booster pump station
Heartland Roofing & Construction: 1965 Post Road, New Braunfels
Type of work: renovation/alteration
Estimated cost: $130,000
Timeline: Sept. 30, 2022-Jan. 15, 2023
Scope of work: this project includes renovations/alterations to an existing structure to accommodate the future use as office and warehouse space
Fast Aid Urgent Care: 229 FM 306, Bldg. A, Ste. 103, New Braunfels
Type of work: new construction
Estimated cost: $525,000
Timeline: Sept. 15-Dec. 15
Scope of work: interior finish-out
Texan Drywall: 1965 Post Road, Bldg. 3, Ste. 340, New Braunfels
Type of work: renovation/alteration
Estimated cost: $130,000
Timeline: Sept. 30, 2022-Jan. 15, 2023
Scope of work: this project includes renovations/alterations to an existing structure to accommodate the future use as office and warehouse space